ATSB Anro Teguh executed a critical and technically complex high-voltage infrastructure project: 132kV Switchyard Installation & Commissioning.
- Location
- Pahang
- Client
- Tenaga Nasional Berhad
- Contractor
- ATSB Anro Teguh Sdn Bhd
ATSB Anro Teguh delivered complete 132kV switchyard installation encompassing power transformers, circuit breakers, and high-voltage switching equipment.
All high-voltage equipment was precisely installed with rigorous safety protocols including transformer positioning using heavy-lift cranes, circuit breaker assembly, control panel integration, and busbar connections throughout the switchyard infrastructure. The specialized installation approach includes foundation preparation for multi-ton transformers, steel structure erection, precise alignment of high-voltage equipment, cable terminations, and protection relay systems—ensuring reliable power transmission and distribution for the national grid. The comprehensive scope covers civil works, structural steel installation, primary and secondary equipment commissioning, oil filling and testing of transformers, and complete electrical protection systems—technical excellence that delivers critical power infrastructure meeting stringent utility standards. The meticulous testing and commissioning procedures including high-voltage testing, protection relay coordination, and operational readiness verification guarantee system safety and reliability, establishing robust switchyard infrastructure that supports uninterrupted power supply to thousands of consumers.
This 132kV Switchyard project exemplifies our expertise in utility-grade high-voltage installations, with enhanced scope covering transformer replacement, circuit breaker upgrades, protection system modernization, and strict compliance with TNB technical specifications and safety standards compared to standard electrical projects.